Project Ban Muang II /Sakon Nakhon
CLIENT    Private Investor
COD    2013
   THAILAND
   1.21 MW
SCOPE PARTIAL BOS
The scope of work included installation works and material supply for:
- Land survey and foundation recalculation and re-alignment
- Structure foundation
- Mechanical Installation
- DC Electrical installation: solar cable wiring, power cable, String Combiner Box, cable trays
- AC Electrical installation: MDB panel, Junction box, Inverter installation and interconnection
- Plant Monitoring
- Grounding system
- Fencing and front gate
Solar PV Power Plant /Crucero-María Elena
CLIENT   Sunedison
COD   2014
   CHILE
   18 MW
SCOPE FOUNDATION AND MECHANICAL INSTALLATION
Solventia Solar was in charge of the following installation items for single axis NexTracker system:
- Pre-drilling and tracker column ramming
- Tracker assembly
- PV module mounting
- Tracker control panels installation
Solar PV Power Plant/ San Andrés
CLIENT   Sunedison /TSE
COD   2013
   CHILE
   7 MW
SCOPE FOUNDATION & MECHANICAL INSTALLATION
Solventia Solar was in charge of the following installation items for single axis NexTracker system:
- Pre-drilling and tracker column ramming
- Tracker assembly
- PV module mounting
- Tracker control panels installation
Rural Electrification with Solar PV/Esquiña
CLIENT   Camarones City
COD   2013
    CHILE
   29 KW
SCOPE COMPLETE EPC
Solventia Solar was in charge of the complete EPC solution for the rural electrification project, including:
- Engineering and design
- Aerial distribution grid and individual MDB
- Canopy as support structure
- Inverter and battery building
- Electrical and mechanical installation
- Battery bank
- Diesel generator backup
- Monitoring
Solar PV Power Plant/ Alanzar-Alange
CLIENT   Sunpower
COD   2011
   SPAIN
   11.62 MW
SCOPE PARTIAL BOS
Solventia Solar was responsible for the following works in this single axis tracking system plant:
- Site preparation, land clearing and leveling
- Civil works: drainage system, fencing, internal roads, underground ducting
- Grounding System
- DC wiring and installation
- AC LV/MV electrical installation
- Motor control panels
- Inverter rooms, transformers and MV switchgear
- Control building
- Auxiliary systems: CCTV, lighting, fire suppression
Solar PV Power Plant/ Casas de Don Pedro
CLIENT   Sunpower
COD   2010
   SPAIN
   10 MW
SCOPE ELECTRICAL INSTALLATION & MV INTERCONNECTION
Solventia Solar was responsible for the following works:
- DC wiring and installation
- LV AC electrical installation
- MV electrical installation
- 2 km MV Interconnection line
- Auxiliary system