Solar PV Power Plant/ Guijo de Coria
CLIENT   Solarpack
COD   2010
   SPAIN
   6.18 MW
SCOPE ELECTRICAL INSTALLATION & UNDERGROUND CONDUIT
Solventia Solar was responsible for the following works:
- Underground electrical duct handhole/manhole
- DC wiring and installation
- LV AC electrical installation
- Motor control panels
- Auxiliary system
Solar PV Power Plant/ Sol de Alconchel
CLIENT   Siemens AG
COD   2009
   SPAIN
   10 MW
SCOPE ELECTRICAL & MECHANICAL INSTALLATION
Solventia Solar was responsible for the following work::
- AC/DC electrical installation
- PV Module mounting
Solar PV Power Plant/ Alconera
CLIENT   Elecor SAUE
COD   2009
   SPAIN
   7.2 MW
SCOPE ELECTRICAL INSTALLATION
Solventia Solar was responsible for the following works:
- DC wiring and installation
- LV AC electrical installation
- MV electrical installation
Solar PV Power Plant/ Tejeda del Tietar
CLIENT   Solarpack
COD   2009
    SPAIN
   5.76 MW
SCOPE ELECTRICAL INSTALLATION & UNDERGROUND CONDUIT
Solventia Solar was responsible for the following works:
- Underground electrical duct and handhole/manhole
- DC wiring and installation
- LV AC electrical installation
- Motor control panels
- Auxiliary system
Solar PV Power Plant / Olivenza
CLIENT   Sunpower
COD   2008
   SPAIN
   18 MW
SCOPE PARTIAL BOS
Solventia Solar was responsible for the following works for this single-axis tracking system:
- Earthworks
- Tracker foundation (precast concrete blocks)
- Drainage system
- Underground electrical duct
- Fencing
- Tracker assembly and PV module mounting
- Grounding system
- Electrical installation
- 6km MV interconnection line
- Auxiliary system
Solar PV Power Plant/ Llerena
CLIENT   Solarpack
COD   2008
   SPAIN
   8.8 MW
SCOPE ELECTRICAL INSTALLATION & MV INTERCONNECTION
Solventia Solar was responsible for the following works:
- DC wiring and installation
- LV AC electrical installation
- MV electrical installation
- 3 km MV Interconnection line
Solar PV Power Plant/ Tussol - Alvarado
CLIENT   Tussol
COD   2006
   SPAIN
   5 MW
SCOPE BOS
Solventia Solar was responsible for the balance of system for the dual axis tracking PV power plant including the following works:
- Earthworks
- Tracker foundation
- Dual-axis tracker erection and mechanical installation
- PV module mounting
- Electrical installation DC and AC
- Inverter substation integration
- Transformer and MV switchgear and RMU
- Auxiliary system